Search

Traffic chaos on M25

PUBLISHED: 17:32 28 April 2011

M25 was gridlocked due to a lorry shedding it's load

M25 was gridlocked due to a lorry shedding it's load

Archant

Traffic is at a standstill on the M25 and stretches of the A2 following an accident this morning.

A lorry shed 45 tonnes of scrap metal at junction 1a - Swanscombe and Erith - at around 7.30am and the slip road remains closed due to recovery operations.

Congestion worsened after a four car collision on the M25 close to the crossing at 10.30am. There were no injuries.

At tailbacks had begun to affect traffic as far back the A2 as the Pepperhill roundabout, with Sainsbury’s shoppers stuck in the car park waiting to get out.


If you value what this story gives you, please consider supporting the Gravesend Reporter. Click the link in the yellow box below for details.

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad, serving as your advocate and trusted source of local information. Our industry is facing testing times, which is why I’m asking for your support. Every single contribution will help us continue to produce award-winning local journalism that makes a measurable difference to our community.

Thank you.

Most Read

Most Read

Latest from the Gravesend Reporter